Showing posts with label two weeks. Show all posts
Showing posts with label two weeks. Show all posts

Monday, July 1, 2013

The look of two weeks into construction.

Here is the progress at two weeks in. Factoring in that most of the time was drilling holes, positioning tubes and waiting for concrete to set. On a roll now.

My goal by the fourth is to have all the remaining 6x6 beams up, the floor joists, and the cedar racking beams (Also a means to attach the 4x8 sheet plywood (Not using drywall) and a place to hang items from such as the tv or pictures) and a tarp roof over the entire structure. Also, have the solar array finished, panels attached, and wired.

I was staring at my partial structure this afternoon before getting rained out again. This Tiny Home looks huge. These 10 foot beams are sitting atop a foot of concrete pier. Leaving a 2 foot space beneath the floor joists. My eyes grow wide when I think of this structure going up a further 5 feet for the roof trusses.

The two foot raised floor serves two functions. One is that it keeps any future flooding being a non issue. The second being that I can use the space underneath the tiny house to create full length drawer lockers for tools or anything really. Basically leaving me the possibility of  designing a tiny home with ample storage under the house itself.

How neat is that?

ps. I'm also still pondering creating a secure cat run underneath the house as well.

Just to make sure you know, that I know, to level.
Yep. I'm single-handedly moving 6x6x8 (or 10) over my head and onto concrete posts.


Sitting atop my 10ft perch and YES, I see you!

This is where I sit when I want to sit.

Looking good.

Solar array near finished. 3 out of 6 beams/posts up for the Tiny house. Set 2 feet off the ground.